This estate is a 5 hectare parcel of land located Off Lekki-Epe expressway, Sangotedo.Pearl Nuga is located along the on-going Lagos State dual-carriage road currently under construction. It is less than 3 minutes drive from the company’s on-going Pearl Garden/Cola Estates.
The property is planned as a fully serviced residential estate; it will comprise of 116 Terrace houses and 21 serviced residential plots for customised development.
The Terrace houses (three bedroom detached duplex) are functionally designed to be spacious with natural lighting and ventilation. All rooms are on the upper floor (en-suite) with a box room. The living room, dining room and kitchen are on the ground floor with an attached servant’s quarters.
Features;
Adequate vehicular parking.
Spacious, well-laid out family units.
Beautifully landscaped green-areas with personal gardens
Good road network.
24 hours water supply.
Option of alternative Power supply.
Customized building construction/design for plot owners.
Guaranteed ownership authenticity, as well as easy transfer of ownership.
Proximity to Free Trade Zone and West Africa’s largest deep seaport.
Stable, fool-proof investment.
Buy in to the future now with an initial deposit of 50% of Asset value,while the outstanding balance is spread over the construction period using a flexible payment plan.
This is a Lagos state government allocation to CMB located in Sangotedo Ajah, off the Lekki-Epe expressway. The parcel of land is a short distance from the company’s on-going Pearl Gardens, Cola and Nuga Park Estates. The proposed estate offers serviced plots and also an option of customised building designs. A beautiful and controlled environment which will be maintained by the company.
With the provision of top quality infrastructure by CMB, the property will serve as good asset for home owners as well as investors.
The increasing need for housing in Ogun state has given rise to Pearl Coppice –a partnership between CMB and the Ogun state government to provide quality and affordable housing to the populace. The company emerged the governments’ preferred developer with a mandate to drive our vision of good and affordable housing in the state.
The development is a 1.3 hectare parcel of land located in the serene, pleasantly undulating environment of Ibara GRA, Abeokuta. It comprises 28 housing units; 3-bedroom family units (all rooms ensuite plus service quarters), 8 blocks of 16 semi-detached units and 3 blocks of 12 Terrace units.
The estate will offer a beautiful living environment which will be properly managed by our in-house Estate Managers.
This project commenced with CMB leading the development drive as owners, agents, developers and facilitators with a brief to provide infrastructure (basic amenities) for the estate - Provision of roads, drainage, electricity, and water supply. We have also secured offers from PMIs enabling stakeholders to access construction mortgages at advantageous rates for personal residences within the estate. These residences are to be constructed by CMB.
Up to date, we have added several approvals for individual mortgages and added construction of first class residential buildings to the infrastructure.
Eight (8) Hectares of land primarily purchased by various corporate individuals including members of the Coca Cola Corporative situated next to the previously mentioned Pearl Gardens Estate. CMB became developers and facilitators of this project with a brief to provide Infrastructure in terms of roads, water, drainage, electricity, perimeter fence etc. Physical works have started on site effectively.
Pearl Apartments is a 2 Block Complex comprising 26 Units of modern, furnished 3 bedroom flats ALL ensuite with a pent house on each block. It is located within the Ebute – Metta axis of Lagos State.
It is a minute drive to the 3rd Mainland Bridge and easily accessible to the Mainland. The land area is 2,828.537 sq.m on a firm and compact soil area. The complex has facilities such as swimming pool; roof top terraces; a gazebo hut, 24/7 internet facilities and adequate vehicular parking space.
It is to be sold off – plan at N26 million per flat. 30% deposit of the selling price reserves a unit for the buyer. The payment plan for the outstanding balance spans the construction period of 12 – 18 months.
CMB, as the developers of this complex, in consonance with our integrity, promise to deliver within the stipulated construction period.
The geometrical progress being made by Lagos State with regard to infrastructure development has created a constant and glaring need for building materials especially asphalt; this has provided CMB the opportunity to tap into this niche market. We have initiated and have secured commitment from the Government which has aided our negotiations with an Asphalt Plant Manufacturing Company abroad, who have now agreed to deliver into the country the Asphalt plant on very favorable terms.
Presently, we are in the process of securing the commission of the project by the State Government to facilitate the conclusion of the transaction.